Every electrical decision, from transformer size to cable size, depends on the load. If the load is guessed, equipment ends up oversized and costly, or undersized and unsafe.
Connected load and demand
Connected load is the total rating of everything that can be plugged in or wired. Not all of it runs at once, so designers apply a demand factor and a diversity factor to estimate the realistic maximum demand. Different areas, such as lighting, air conditioning, lifts, pumps and IT equipment, use different factors.
Steps of a load calculation
- Collect the equipment list from architects, mechanical and fire teams.
- Group loads by type and by distribution board.
- Apply demand factors and add future growth.
- Check power factor and decide on correction if needed.
- Use the result to size the incoming supply, transformer, generator, main and sub-main cables and breakers.
What the result guides
- Transformer and utility connection application
- Generator and UPS size
- Busbar, cable and protection ratings
- Earthing and fault level checks
- Energy-saving options such as efficient lighting or power factor correction
Common mistakes
Forgetting future floors, counting starting currents wrongly, ignoring fire pump and lift loads in generator sizing, and leaving no spare capacity in the panels. A review by a qualified electrical engineer before ordering equipment prevents these. See our electrical design service.
Questions to ask before you decide
- Who provided the equipment load list?
- What demand factors were used and why?
- How much spare capacity is left for growth?
- Were fire and life-safety loads included in generator sizing?
Our team can help with this. See our electrical design and distribution, or send us your requirement.
Planning something similar?
Tell us about your building and what you need. We reply within 24 hours.
This is a planning overview. A qualified professional must determine site-specific design and requirements.