A generator and a UPS do different jobs. The UPS carries the load for a short time with no break, and the generator takes over for long outages. Sizing them correctly means knowing which loads must keep running.
Separate critical from non-critical load
List what must stay on: servers, network gear, emergency lighting, fire pumps, lifts for evacuation, security systems. Non-critical loads can wait or be shed. Sizing for everything raises cost without need.
Sizing a UPS
- Add up the real load in kW and kVA, not only nameplate ratings.
- Decide the runtime: from minutes until the generator starts, to longer if there is no generator.
- Add margin for growth and for battery ageing.
- Consider redundancy such as N+1 for important rooms.
Sizing a generator
- Include the starting current of motors, pumps and compressors, which can be several times their running current.
- Include the UPS charging load and non-linear loads.
- Plan fuel storage for the number of hours you need.
- Use an automatic transfer switch where fast changeover is required.
Keep them reliable
Run the generator on load at regular intervals, check fuel quality and batteries, and test the full changeover. See the broader data centre planning guide for how power fits with cooling and fire protection.
Questions to ask before you decide
- Which loads are critical?
- What runtime does the UPS provide?
- Were motor starting currents counted for the generator?
- When was the last full load and changeover test?
Our team can help with this. See our data centre power design, or send us your requirement.
Planning something similar?
Tell us about your building and what you need. We reply within 24 hours.
This is a planning overview. A qualified professional must determine site-specific design and requirements.